Inspection, Reconditioning and Testing of Low Voltage Circuit Breakers
I. Introduction
Individual standards covered in this introduction are:
II. Components
III Testing and Inspection
Section I for PEARL Section 1200 Low Voltage Circuit Breakers begins with reference table identification and identification of the test equipment necessary to complete the standards. The following test equipment is required to perform the testing requirements of this reconditioning standard:
1. Insulation Resistance Test Set (Megohmeter) 1000 Vdc minimum
2. High Current Test Set
One of the following pieces of test equipment is required to perform the contact resistance testing requirements of this reconditioning standard:
1. Digital Low Resistance Ohmmeter (DLRO - 10 amp unit is sufficient.)
2. DC Current Source and a Millivoltmeter
One of the following pieces of test equipment may be required to perform the testing requirements of this reconditioning standard, depending on the accessories:
1. AC Voltage Supply
2. DC Voltage Supply
Section II Recondition Evaluation-Inspection and Testing identifies each component and assembly part that must be inspected to determine the components viability and scope of reconditioning required to bring the component back to original operating condition. Results and notes from the pre-reconditioning inspection and test are recorded in the PEARL Reconditioning Evaluation and Test forms that accompany each respective standard.
IV Reconditioning
Assembly of the reconditioned components and subassemblies is followed by final inspection and testing. As with all testing, inspection, and reconditioning operations, final inspection and test results are recorded onto the Evaluation and Test forms included with the standard. If a PEARL certified technician follows the reconditioning standard, the low voltage circuit breakers assembly is eligible for a Blue PEARL Reconditioned Quality Seal.